

CleanAIR Full Mask Shigematsu GX02
1–5 business days



Package contents:
Options and additional details:
Spasciani TR82 compressed air respirator kit with full face mask and AC190 filtering unit is an airline respiratory protection system designed for asbestos work and industrial environments requiring continuous breathable air supply and full-face protection.
The system operates as a continuous flow compressed air respirator delivering filtered air directly to the user. The key functional benefit is stable airflow and positive pressure inside the mask, supporting consistent protection throughout the work period.
The package is assembled in-store after ordering, enabling controlled configuration and ensuring component compatibility for the intended application.
The product is suitable for asbestos removal, chemical handling, confined space work and industrial cleaning tasks where exposure is high and continuous protection is required. It is intended for applications where a documented and consistent protection level is necessary.
The product is not suitable without EN 12021 compliant air supply or for environments containing gases such as carbon monoxide not removed by the filtration unit. In practice, the system is selected where protection must remain stable and independent of filter loading.
Regulation concerning asbestos removal is tightening, increasing the employer’s responsibility to ensure adequate respiratory protection. Inspections focus on whether protection can be considered unequivocally sufficient in all conditions.
This has led to increased adoption of compressed air systems, as their protection level is consistent and demonstrable without interpretation.
In practice, this requires evaluating current respiratory protection and transitioning to compressed air solutions before regulatory changes take effect.
Warranty terms are specified separately on the product page or in quotation.
Delivery time is factory order, typically approximately 2–4 weeks. Confirm exact lead time with the seller.
Technical inquiries should be submitted in writing to ensure correct specification of air supply, connections and application requirements.
The package is assembled in-store after ordering. Delivery is based on factory order lead time (approximately 2–4 weeks).
Delivery methods and availability are specified separately on the product page. Exact delivery time is confirmed at order stage.


1–5 business days
In stock now







In stock now
